Temporary traffic signals planned for WYO 22/WYO 390 Intersection
JACKSON, Wyo. (KIFI) - The Wyoming Department of Transportation, along with contract crews from Modern Electric Co., will be installing temporary traffic signals at the intersection of Wyoming State Highway 22 and Wyoming State Highway 390.
This project is part of ongoing intersection upgrades aimed at improving safety and traffic flow at the WYO 22/WYO 390 junction. The existing traffic signal will be deactivated, and a temporary set will be installed on March 11, weather permitting. Work is scheduled for Monday, from 10:00 a.m. to 3:00 p.m.
Flaggers will be on-site to direct traffic around the equipment used for signal removal. While long delays are not anticipated, motorists should expect some slowing. The temporary signals will remain operational until the new permanent signal is constructed (anticipated completion in early April). Traffic flow patterns will be maintained during construction:
- Southbound WYO 390: One lane will be open for both left and right turns.
- Westbound WYO 22 to Northbound WYO 390 (Right Turn Lane): This lane will remain open but will be narrower than usual. Drivers are advised to use caution and proceed slowly.
Unpredictable weather and other variables may necessitate last-minute changes to the plans.